Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Abdel-Razek, R H (1997) How Construction Managers Would Like Their Performance to Be Evaluated. Journal of Construction Engineering and Management, 123(03), 208–13.

Arditi, D, Khisty, C J and Yasamis, F (1997) Incentive/Disincentive Provisions in Highway Contracts. Journal of Construction Engineering and Management, 123(03), 302–7.

Bernold, L E, Lorenc, S J and Luces, E (1997) Intelligent Technology for Truck Crane Accident Prevention. Journal of Construction Engineering and Management, 123(03), 276–84.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(276)
  • Abstract:
    Sideand shock-loading of cranes can cause boom and turret drive gear failures with fatal results. However, traditional overload systems do not protect against these types of critical loading conditions, and crane capacity charts only consider the normal loading case, vertical lifts. In the maintenance of bridges, crane operators in any state department of transportation are presented with situations in which they have to pull debris and entire trees that are lodged against bridges. Dragging and shock-loading are commonplace. Researchers from the Construction Automation and Robotics Laboratory at North Carolina State University have developed an innovative crane monitoring system capable of warning an operator who enters a danger zone and storing information about critical events on an electronic device. Acting like a black box on an airplane, the storage device allows this information to be downloaded by a supervisor in order to assess how a particular crew “worked” the crane. This paper presents the results of this project and discusses the basic components of the accident prevention system for cranes.

Carr, R I (1997) Engineering and Construction Management: Leadership and Opportunity. Journal of Construction Engineering and Management, 123(03), 292–6.

Chua, D K H, Kog, Y C, Loh, P K and Jaselskis, E J (1997) Model for Construction Budget Performance—Neural Network Approach. Journal of Construction Engineering and Management, 123(03), 214–22.

Dzeng, R and Tommelein, I D (1997) Boiler Erection Scheduling Using Product Models and Case-Based Reasoning. Journal of Construction Engineering and Management, 123(03), 338–47.

El-Bibany, H (1997) Parametric Constraint Management in Planning and Scheduling: Computational Basis. Journal of Construction Engineering and Management, 123(03), 348–53.

Eldin, N N (1997) Concurrent Engineering: A Schedule Reduction Tool. Journal of Construction Engineering and Management, 123(03), 354–62.

Everett, J G and Yang, I (1997) Workers' Comp. Premiums: Disparities in Penalties for Identical Losses. Journal of Construction Engineering and Management, 123(03), 312–7.

Fischer, M and Tatum, C B (1997) Characteristics of Design-Relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(03), 253–60.

Hampson, K and Fischer, M (1997) Structural Designs and Construction Technologies for California Highway Bridges. Journal of Construction Engineering and Management, 123(03), 269–75.

Hancher, D E, Garza, J M d l and Eckert, G K (1997) Improving Workers' Compensation Management in Construction. Journal of Construction Engineering and Management, 123(03), 285–91.

Hassanein, A and Melin, J (1997) Crew Design Methodology for Construction Contractors. Journal of Construction Engineering and Management, 123(03), 203–7.

Huang, X and Bernold, L E (1997) CAD-Integrated Excavation and Pipe Laying. Journal of Construction Engineering and Management, 123(03), 318–23.

Ibbs, C W (1997) Quantitative Impacts of Project Change: Size Issues. Journal of Construction Engineering and Management, 123(03), 308–11.

Karshenas, S (1997) Strength Variability of Conventional Slab Formwork Systems. Journal of Construction Engineering and Management, 123(03), 324–30.

Li, H and Love, P (1997) Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. Journal of Construction Engineering and Management, 123(03), 233–7.

Naresh, A L and Jahren, C T (1997) Communications and Tracking for Construction Vehicles. Journal of Construction Engineering and Management, 123(03), 261–8.

Owers, R and Weber, S L (1997) Strategic Plan for Southwest Indian Community's Construction Business. Journal of Construction Engineering and Management, 123(03), 331–7.

Price, A D F and Shawa, H (1997) Survey of Project Related Finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(03), 223–32.

Puddicombe, M S (1997) Designers and Contractors: Impediments to Integration. Journal of Construction Engineering and Management, 123(03), 245–52.

Scott, S (1997) Delay Claims in U.K. Contracts. Journal of Construction Engineering and Management, 123(03), 238–44.

Touran, A and Suphot, L (1997) Rank Correlations In Simulating Construction Costs. Journal of Construction Engineering and Management, 123(03), 297–301.